THE  FACTS

● The Seawind Demonstrator shows a 50% cost reduction compared to traditional offshore demonstrator projects for both bottom fixed and floating solutions.

● Seawind is engaging with DNV-GL for design certification of the Seawind  6.2 MW turbine and structure.

● Seawind is investigating several potential sites for the demonstrator 6.2 MW.

● The final location will be decisive in choosing for the bottom fixed or floating solution.

seawind-6-demonstrator-002